APC AR2105BLK Fiche technique Page 19

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 18
NetShelter VX 25U Enclosure 15
Vertical Mounting Rails
The vertical mounting rails are factory-installed in the proper position for use with rack-mountable
equipment that has a depth of 29.13 inches (740 millimeters).
To accommodate different rails or equipment with various
depths, you can adjust each rail from front to rear over a
range of 2.35 inches (60 millimeters).
How to adjust the mounting rails on the frame posts
1. Use the 5-mm hex wrench (provided) to loosenbut not removethe four pan-head screws in
the slots of each vertical mounting rail.
2. Slide the rails forward or rearward. Use a level to make sure each mounting rail is vertical.
Tighten each screw.
2.35 in.
(60 mm)
Warn
i
ng
To avoid personal injury or damage to the enclosure, perform this procedure with
no equipment installed on the vertical mounting rails.
Vue de la page 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 27 28

Commentaires sur ces manuels

Pas de commentaire