Metered Rack Power Distribution Unit 3
Mounting options
You can install the PDU in one of two ways: using
toolless mounting pegs (provided) or mounting
brackets (provided). The 1-U and 2-U horizontal
PDUs must be mounted using the horizontal
mounting brackets.
Vertical mounting.
To install the PDU using the toolless mounting
method, install it in the rear of the NetShelter
®
VX or SX Enclosure, in the cable channel
directly behind the rear vertical mounting rails.
• To install the PDU using the mounting
brackets, install it on a vertical mounting rail
on your rack or enclosure.
Horizontal mounting.
To install the PDU using the horizontal mounting
brackets, install the brackets on the PDU and then
attach the PDU to the rack using cage nuts
(provided with your enclosure).
Toolless mounting
1. Slide both mounting pegs into the holes
located in the channel in the rear panel of the
enclosure.
2. Snap the PDU into place by pushing it down-
ward until it locks into position.
Note
You can mount two PDUs on one side
of the enclosure by using the toolless
mounting method.