APC NBRK0570 Spécifications Page 13

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 36
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 12
7NetBotz Rack Monitor 450/550/570 Installation and Quick Configuration Manual
Power cord and network cable connections
Caution: Before you energize the appliance, review the electrical specifications on page 23
to avoid overloading the circuit.
Caution: Make sure you properly ground the appliance by plugging the power cord directly
into a wall outlet or by verifying the ground path if using a power strip.
Note: The power cords provided are to be used only with APC NetBotz products.
1. Connect the appropriate power cord to the AC Line Inlet of the appliance.
2. Secure the power cord to the power cord retainer bracket using the tie wraps.
3. Connect a network cable to the 10/100 Base-T Network Port on the appliance.
4. Plug the power cord into a power source.
5. Use the hook and loop cable strap to secure the cables.
Vue de la page 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 35 36

Commentaires sur ces manuels

Pas de commentaire