28 InfraStruXure System - Installation and Start-Up
Route Data Cables to the InfraStruXure
Manager Hub (or Switch)
1. Connect a CAT-5 network cable (provided) to the network or 10BaseT ports on your APC
InfraStruXure devices. The following devices need to be connected:
2. Run the connected CAT-5 network cables through the data cable troughs to the InfraStruXure
Manager Hub (or Switch).
3. Connect each device’s network cable to any available station port in the InfraStruXure Manager
Hub (or Switch). Station ports are those with an x after the number (e.g. 2x).
Automatic Transfer Switch
Environmental Monitoring Unit
Rack PDU
Symmetra PX UPS
InfraStruXure PDU