42 InfraStruXure System – Service Manual – Installation and Start-Up 990-1467C
Route and Attach Overhead Wiring
Connect the sub-feed power cable conductors to a three-pole breaker on the PDU
Electrical Hazard: Only licensed electricians or APC Field Service Engineers can
connect the sub-feed power cable conductors to a breaker on the PDU. Ensure that
the RDP breakers are OFF before beginning this procedure.
The sub-feed power cable is connected to the RDP and the cable’s wires are terminated with ferrules.
Note: If you ordered the alternative connection, your PDU and RDP have sub-feed power
cables that terminate with IEC 309 connectors. If you have this option, the procedure
below does not apply.
To connect the sub-feed power cable to the PDU:
1. Route the sub-feed power cable from the RDP to the PDU through the Shielding Troughs.
2. Route each phase conductor (L1, L2, L3) through a current sensor (secured to the PDU
enclosure) and secure the current sensor to each conductor using a wire tie (provided).
3. Connect the power
cable’s individual wires
(see the illustration):
a. Connect each phase
conductor (L1, L2,
L3) to the appropriate
pole on one of the
three-pole breakers
(sub-feed breakers) at
the bottom of the
panel.
b. Connect the neutral
wire to a termination
point on the Neutral
Bar (N) at the top of
the distribution panel.
c. Connect the ground
wire to a ground lug
(G) at the bottom of
the distribution panel.
N
G